top of page

FlowMax™ Deepwater Applications
- Hole Cleaning
Annular velocity is the single most important parameter in the hole cleaning process. FlowMax™ increases the AV at a selected point in the drillstring and greatly improves hole cleaning.

- Reduce Bottoms Up Time
Reduce bottoms up time when flow rate is restricted by BHA

50% Time Savings


- Wellhead Jetting
-
Jet wellhead on trip out of hole
Save Dedicated Jetting Trip

- Wellbore Cleanout
-
Use multiple tools in tandem to increase displacement efficiency and reduce bottoms up time
-
Ability to spot pill on bottom with tool closed, increase flow rate once pill above tool

-
750 gpm to bottom of BHA
-
Boost 750 gpm via 1st Stage FlowMax to 13 5/8” annulus
-
Boost 500 gpm via 2nd Stage FlowMax at Wellhead
-
Put dedicated pump on boost line to boost Riser flow by 500 GP

Reduced Bottoms Up Time
bottom of page